top of page
Search

Commissioning cell for IKEA Malm frames

Updated: Sep 20

Customer: Meyenburger Möbel GmbH / Märkisch Prignitzer Möbel GmbH & Co. KG


Pick an Place commissioning cell for separating and inserting frames from the IKEA Malm-series

Pick an Place commissioning cell for separating and inserting frames  from the IKEA Malm-series
Commissioning cell for IKEA Malm frames

  • fully automated order picking with various conveyor systems and 4 robots

  • 2 palletizing robots for removing the frame components and stacking empty pallets

  • 2 articulated-arm robots for inserting the components into packaging boxes of different sizes

  • dynamic insertion of the components in motion

  • accumulation, buffering and separation section for stacked components including automatic track width adjustment

  • commissioning for 6 product variants

  • roller conveyor system for material infeed and outfeed

  • control cabinet with Siemens control system, PLC and touch display

Logo Meyenburger Möbel




 

Contact one of our experts and start your project with us.


bottom of page